Madison Electric Works (MEW) in Madison, Maine recently selected IGS Solar to install a solar energy generating facility at the Madison Area Business Park. The facility, with maximum capacity of up to 4.4 MW (enough to power about 880 homes) will be designed and installed by Advanced Solar Products and Cianbro.
A public ribbon-cutting and tour are scheduled for July 21 at 10 a.m. at the site of the second largest solar array in New Hampshire, known as the Oyster River Forest Solar Array.
IGS CNG Services announced the opening of its compressed natural gas (CNG) fueling station in partnership with Montgomery County in Moraine, Ohio, just outside of Dayton.
Central Oregon Community College (COCC) recently signed on with IGS Solar to install a solar energy system at the college’s Redmond campus, located 15 minutes north of their main Bend location.